1 of 5
  • Step 1

    When your flooring is delivered, empty your garage and thoroughly sweep the concrete surface to remove any dust.

  • Step 2

    Lay the first two rows of tiles along the garage door. Attach the edging pieces, then close the garage door and push the rows to ensure they fit.

  • Step 3

    Follow your design and continue placing full tiles until most of the floor is done. As you do that, make sure the layout is centered and ensure that the space between the tiles and the walls is equal on both sides.

  • Step 4

    Trim tiles as needed for a perfect fit around obstacles and walls.

  • Step 5

    Finish the installation by adding the edgings and corners at entrance/exit points.

Tutorial: Learn how to use our floor designer

Certifications & Tests Passed

  • EN BS 7976:2 Slip Resistance Test
    Our tiles have undergone rigorous testing to ensure maximum slip resistance, providing a safe and stable surface in both wet and dry conditions.
  • EN 13501-1 Reaction to Fire
    Tested and certified for fire safety, our tiles meet the EN 13501-1 standards, ensuring enhanced protection and peace of mind.